Cleveland Heights High School – Cleveland Heights, OH

General Project Scope: HOMRICH was contracted to perform the abatement and demolition of the 400,000 square foot high school and selective demolition of a 100,000 square foot section of the school to remain. Project highlights include: LEED recycling goals were met on this project. Over 10,000 tons of scrap and demolition debris was processed for […]

Oil City Parking Garage – Oil City, PA

General Project Scope: HOMRICH was contracted to complete demolition and abatement of the Oil City parking structure, a 6-level, 500 space, post-tensioned facility located in the heart of downtown Oil City, PA. HOMRICH worked closely with PennDot, Oil City, and Venango County to coordinate the closing and re-routing of streets and sidewalks in order to […]

Chanute AFB White Hall – Rantoul, IL

General Project Scope: White Hall was a 440,000 square foot, 4-story structure that sat atop a 168,000 square foot crawlspace. It was the largest building owned by the Department of Defense prior to construction of the Pentagon. Due to deteriorating conditions, the entire building was set up in negative pressure containment and the interior contents […]

Bates Garage – Detroit, MI

General Project Scope: HOMRICH was contracted to provide demolition and abatement services on the Bates Garage parking structure, a 5-level, 600 space, post-tensioned facility located in the heart of downtown Detroit. HOMRICH worked closely with MDOT and the City of Detroit to coordinate the closing and re-routing of streets and sidewalks in order to accommodate […]

Accident Fund – Lansing, MI

General Project Scope: HOMRICH was contracted to perform the total demolition of a 6-story, 325,000 square foot post-tension parking deck. The project was located approximately two feet from an active parking deck and 16 feet from an adjacent historical building. HOMRICH’s High Reach and Ultra-High Reach Excavators were utilized on the project to methodically dismantle […]

Detroit Land Bank Authority (Residential) – Detroit, MI

General Project Scope: As part of Detroit’s efforts to eliminate blight, HOMRICH has supported the Detroit Land Bank Authority (DLBA) to complete asbestos abatement and demolition of abandoned residential properties for over ten years. Following are the highlights: Approaching abatement and demolition of 5,000 structures within a 139 square mile foot print. Averaging 11 crews […]

City of Detroit (Commercial) – Detroit, MI

General Project Scope: As part of Detroit’s efforts to eliminate blight, HOMRICH has supported the City of Detroit to complete asbestos abatement and demolition of abandoned commercial properties for over ten years. Following are the highlights: Abatement and demolition of 100’s of structures within a 139 square mile area. Restoration of demolished sites including topsoil, […]

J.L. Hudson’s – Detroit, MI

General Project Scope: HOMRICH was contracted to perform the demolition of the 2.2 million square foot building that reached 25 stories tall and heights of 410 feet above grade: Removed all interior nonstructural items from the four basement levels to allow for the explosive charges to be placed for proper felling of the building. Installed […]

Cass Tech High School – Detroit, MI

General Project Scope: HOMRICH was contracted to perform the abatement and demolition of the 7-story, 830,000 square foot structure. It rested on a 15-foot basement. HOMRICH utilized 6 – 8 machines including a High Reach which has a working height of 105 feet. This allowed HOMRICH to demolish the building systematically and safely with minimal […]

Statler Hilton Hotel – Detroit, MI

General Project Scope: HOMRICH was contracted to perform approximately $8 million abatement and demolition of the former 18-story high-rise structure standing 230 feet with 515,000 square feet of floor space. It rested on a 15-foot basement and an 8-foot sub-basement. HOMRICH crews removed ACM encapsulated in concrete and concealed areas from every room within the […]