General Project Scope:

The project consisted of the interior renovation of the basketball arena including demolition and removal of 10 large air handlers, sound absorbers, and associated vibration pads in a mechanical space 120 feet above the court floor. A Brokk and Bobcat were utilized to demolish and load the debris into 10-yard roll-off containers that were then lifted through an opening in the roof and transported to the ground via crane. Numerous architectural removals included all 1,034 lower and upper bowl concrete steps, utilizing dustless demolition hammers; removal of all catwalk decking and other miscellaneous architectural finishes.