General Project Scope:

HOMRICH performed the demolition of this 120-foot-tall 7-story incinerator building in two phases. The incinerator was located in the middle of the active Wastewater Treatment Plant. In 2007, a partial demolition was performed to allow the construction of a new incinerator building mere feet away from the old building. Nearly four years later, HOMRICH returned to the site to perform the final demolition of the structure. HOMRICH utilized a specialty High Reach Excavator to perform this delicate demolition. All demolition work was performed without disruption to the adjacent newly constructed incinerator building or the active Wastewater Treatment Plant.

  • Salvage of 2,000 tons of ferrous steel
  • Salvage of 150,000 lbs. of aluminum
  • Salvage of 375,000 lbs. of various grades of stainless steel
  • Disposal of 255 yards of construction & dirt debris
  • Recycling of 16,000 tons of concrete & hard fill
  • > 99% of the building was recycled