Metro Health Demolition Project – Highland Hills, OH
Total Demolition | Abatement
General Project Scope:
HOMRICH was contracted to perform the demolition and abatement of the former Metro Health Facility which included two buildings, a water tower and approximately 30,000 container yards of buried debris. The abatement portion included:
- 25,000 linear foot of pipe insulation
- 250,000 square foot of floor tile and mastic removal
- 50,000 square foot of ceiling plaster removal
- 500+ windows with ACM caulk and glazing
- Lead-based paint removal
- Abatement of 2,110 linear foot of steam tunnel and associated line
- Removal of all universal waste, e.g, bulbs, ballast, mercury switches
- Removal of Bio Hazard waste
The demolition scope included the following:
- Complete demolition of 265,000 square foot of building and associated foundations and footings
- On-site crushing of approximately 25,000 tons of concrete to be used as approved backfill
- Felling of a 120-foot water tower
- Hand demolition of a 60-foot smoke stack
- Removal of 2,110 linear foot of Steam Tunnel
- 95,000 square foot of site paving