General Project Scope:

HOMRICH performed selective demolition in Detroit Diesel’s engine, axle, and transmission plant. Piping and ductwork associated with the HVAC system was removed inside the plant, while rooftop equipment was removed during the second phase of the project.

Demolition occurred during the plant’s normal operating hours. HOMRICH took special care not to disrupt plant operations or damage stock and equipment located directly below the systems being demolished. The project was completed to the satisfaction of the owner and without incident.